Scuffed hallways and stair walls
Move-ins, bikes and deliveries leave scuffs and dents along halls and stairwells that cleaning no longer removes.
Painting a condo building is not just a paint job. It involves a board vote, a budget, owners who want notice, cars to move and common areas that never fully close.

$2.25 to $4.85Typical per sq ft of wall area in Quincy. The walk-through sets your number.
Brands we work with: Benjamin Moore, Sherwin-Williams, California Paints, Farrow & Ball, PPG, Fine Paints of Europe, Cabot, Zinsser, York Wallcoverings, Thibaut, Schumacher, Phillip Jeffries, Graham & Brown, Roman.
Condo and HOA painting in Quincy covers common hallways, stairwells, lobbies, doors and building exteriors for associations. We walk the property with the board or manager, provide a written scope, prepare owner notices and a posted schedule, then paint in phases. Typical hallway and stairwell work runs $2.25 to $4.85 per square foot of wall area, and the walk-through sets the real number.
Association projects succeed or fail on communication. Owners want to know when their hallway will smell of paint, when to move their cars from the side lot, and whether anyone needs access to their unit or balcony. Boards want a clear scope they can vote on, a fair price they can explain at the annual meeting, and a schedule that does not drag on for months.
We work directly with the board or the property manager. We put the scope, colors, products and phases in writing, draft notices the board can send to owners, and post schedules in lobbies and on doors before each phase. Our painters keep common areas passable during the work and clean up at the end of every day.

Most associations need the board to approve the color scheme, the scope and the budget before work starts. We meet with the board or manager, walk the hallways and exterior, and write a scope that separates base work from options, such as doors, railings or trim repairs. That makes it easier to vote on what the reserve fund can cover this year.
Color samples are painted on large boards and placed in the hallway or held against the siding so board members see them in real light. Once the scope is approved, we draft a plain owner notice with dates, areas affected, parking changes and who to call with questions, which the manager or board sends out.
Interior common areas cannot close. Residents still need to use stairs and halls, and deliveries still arrive. We paint one floor or one stairwell at a time, keep a clear path along each corridor, use low-odor waterborne paint, and post wet paint signs. Doors to units are painted early in the day so they dry before residents come home.
Hallway walls take traffic from moving furniture, bikes and strollers, so we use a scrubbable eggshell or satin. Unit doors and frames get a hard waterborne enamel, and stair railings and balusters are sanded and enameled. Lobbies often get a slightly richer finish, sometimes with a wallcovering accent wall, since that is the first space visitors see.
Exterior repaints on condo buildings run building by building or side by side, in the May to October season. We wash, scrape, sand, repair rotted trim and prime bare wood before painting siding, trim, doors and railings. Balconies and decks may need staining or sealing at the same time, which we coordinate with owners for access.
Owners get notice before their side of the building is worked on: windows to close, outdoor furniture and grills to move, cars to shift. We plan around weather, dew and wind off Quincy Bay, and we keep ladders and lifts away from entries during busy hours. Lead-safe practices are used on pre-1978 buildings where we disturb old painted surfaces.
Boards change, and the person who chose the hallway color five years ago may have sold. We give the association a written record of every color, sheen, product and location used on the job, which the manager can keep with the building files. That makes later touch-ups, single-unit door repaints and the next full cycle much easier to price and match.
We also leave labeled touch-up paint for halls, doors and trim, stored where the board chooses. When an owner moves out and a hallway gets dinged, maintenance can touch it up in the same color instead of guessing from a faded can.
We walk common areas and exteriors with the board or manager, note damage and access, and talk about colors and timing.
The board gets a written scope separating base work and options, with products, sheens, phases and a typical schedule.
Large samples are placed in the halls or held against the building so the board can approve the scheme in real light.
We draft notices for owners and post schedules in lobbies and on doors before each phase starts.
We paint floor by floor or side by side, keep paths clear, post wet paint signs and clean up each day.
At the end, we walk the property with the board or manager, finish punch list items and leave labeled touch-up paint.
The typical range covers prep, primer where needed and two coats on common hallway and stairwell walls, with standard protection and daily cleanup. Unit doors, railings and exteriors are priced on top. These are planning numbers, and the walk-through sets the real price.
Compare every service side by side in our painting and wallpaper cost guide, or call (617) 576-8235 to set a walk-through.
Move-ins, bikes and deliveries leave scuffs and dents along halls and stairwells that cleaning no longer removes.
Chipped, faded or mismatched unit doors make common areas look neglected and can lower how buyers see the building.
Peeling paint on trim, window casings and siding lets water in. Repainting on schedule prevents rot repairs that cost more.
If the reserve study lists exterior or interior painting for this year, an early walk-through helps the board set the budget.
On buildings near the water, railings, balcony trim and doors fade and chalk faster from salt air and need a tougher enamel.
An exterior that has faded unevenly, or colors that look dated, can be refreshed with a board-approved scheme.
Quincy has a wide mix of associations. Marina Bay and the Squantum peninsula hold waterfront condo buildings and townhouses that take salt wind off the harbor, so railings, balcony trim and doors chalk and fade faster than inland buildings, and exterior phases have to dodge windy days. Mid-rise condo buildings in Quincy Center and along Quincy Shore Drive have long carpeted corridors, elevators and lobbies where most of the work is interior and phased floor by floor.
Others are conversions. Victorians and two-families on Wollaston Hill and in North Quincy were split into two or three units with shared front halls, stairs and porches, plaster walls and clapboard or shingle siding, so association work looks more like a historic house repaint than a new building job. Townhouse complexes in Braintree, Canton and Norwood are wood-frame with vinyl and fiber cement. If your building is in a local historic district, exterior changes may need review, so check with the city or town before choosing a new scheme.
Quincy neighborhoods and nearby towns we cover most often, with ZIP codes:
Yes, if it helps. We can walk the property with the board, answer questions about scope, products and phases, and bring color samples. Many boards prefer to review the written scope first and then invite us to a meeting to talk through options before voting.
We draft a plain notice with dates, areas affected, parking changes and what owners need to do, such as moving balcony furniture. The board or manager sends it out, and we post schedules in lobbies and on doors before each phase.
Yes. Unit entry doors, frames and stair railings are common add-ons. We sand and enamel them with a hard waterborne finish. Doors are painted early in the day so they dry before residents return, and railings are done in sections so one handrail stays usable.
A small two- or three-unit building may take one to two weeks, weather allowing. Larger complexes are phased building by building across the season. Rain, dew and wind off the bay can add days. The written estimate includes a typical schedule, and owners get notice before their side is worked on.
Often. Boards can approve interior halls one year and exteriors the next, or paint the most weathered sides first. We write the scope so each phase stands alone, which makes it easier to match work to the reserve fund.
Peeling clapboard, chalky trim and bare gray wood on the weather side of a Quincy house mean the old paint film has stopped protecting the siding,.
How we do itMost businesses cannot shut down for a week of painting, and they cannot have customers walking past wet walls, ladders and solvent smell either.
How we do itA triple-decker or stacked-porch two-family has porches on every floor, a roof edge three stories up and tenants coming and going all day, so a.
How we do itA screwdriver sinks into your window sill, the corner board crumbles at the bottom, or a porch column has gone soft.
How we do itOur phone is answered around the clock. Tell us about the rooms or the house and we will set a walk-through and a written estimate.